Esbozo de un Plan de Trabajo
El esbozo de un plan de trabajo indica que el proceso de gestión y diseño de proyectos de construcción y la administración de contratos de construcción en una serie de etapas fundamentales de trabajo. Se basa en el Plan Director de RIBA 2007 de trabajo y muestra la relación de las etapas normales de trabajo español.
Haga clic aquí para descargar el PDF
ESTUDIOS PREVIOS | Preparation | A APPRAISAL Identification of Client’s needs and objectives and possible constraints on development. B DESIGN BRIEF Development of initial statement of requirements into the Design Brief with the Client, confirming key requirements and constraints. |
ANTE PROYECTO
PROYECTO BÁSICO |
Design | C CONCEPT Implementation of Design Brief and preparation of additional data. D DESIGN DEVELOPMENT Completion of development of the Project Brief. E TECHNICAL DESIGN Preparation of technical design and specifications for the Project sufficient for co-ordination of all components and elements of the Project, including information for statutory standards and construction safety. |
PROYECTO DE EJECUCIÓN | ||
Pre-construction | F PRODUCTION INFORMATION F1 – Preparation of production information in sufficient detail to enable tenders to be obtained. F2 – Preparation of further production information for specialist installations if required. G TENDER DOCUMENTATION Preparation and collation of tender documentation in sufficient detail to enable tenders to be obtained for the Project. H TENDER ACTION Identification and evaluation of potential contractors and specialists for approval by the Client. |
|
DIRECCIÓN DE OBRA | Construction | J MOBILISATION Letting the building contract, appointing the Contractor. K CONSTRUCTION TO PRACTICAL COMPLETION Administration of the building contract up to Practical Completion. |
LIQUIDACIÓN Y RECEPCIÓN | Use | L POST PRACTICAL COMPLETION L1 - Administration of the building contract after practical completion, making final inspections and settling final account. |